R&D Fuel Station Saudi Aramco – Dhahran
Integrated electro-mechanical works delivered in a high-compliance Saudi Aramco environment, combining disciplined engineering coordination, site execution, testing, commissioning, documentation, and final handover.
Execution aligned with strict site safety, access, permit, inspection, and technical control requirements.
Coordinated electrical and mechanical works from engineering preparation through testing and handover.
Executed through Gulf Namar Contracting Company with dedicated engineering and technical site resources.
Main Contractor, Client & End User
Integrated MEP Delivery in a Controlled Aramco Environment
Aiwa Global Group, through Gulf Namar Contracting Company, successfully delivered the electro-mechanical works for the R&D Fuel Station project in Dhahran. The package covered coordinated MEP execution from engineering preparation and material approvals through site installation, testing, commissioning, and handover.
Working within a Saudi Aramco environment required disciplined safety, permit, inspection, and documentation practices. The project team operated against approved IFC drawings and consultant requirements while supporting MEP shop drawings, material submittals, method statements, testing records, as-built documentation, operation and maintenance manuals, vendor warranties, and final close-out requirements.
Coordinated Site Execution with Engineering Control
Aramco Environment
Executed under strict Saudi Aramco safety, access, work-permit, site-control, and inspection requirements.
Multi-Discipline MEP
Integrated electrical and mechanical delivery under one coordinated work package with engineering supervision.
Documented Handover
Shop drawings, test records, as-builts, O&M manuals, warranties, and close-out documentation formed part of the delivery process.
From Engineering Preparation to Final Close-Out
Supply and execution of coordinated electrical and mechanical works based on approved project drawings and specifications.
Preparation and coordination of MEP shop drawings, material submittals and method statements for consultant review.
Site supervision by electrical and mechanical engineering personnel with trained technical manpower and required tools.
Testing, commissioning, inspection coordination and rectification of comments prior to handover.
Preparation of as-built drawings, testing records, O&M documentation and equipment/vendor warranty records.
Execution under Saudi Aramco safety, access, work-permit and site-control requirements.
Safety, Quality, Testing & Documentation
Controlled Site Execution
Workforce, tools, access, PPE, permits, supervision, and site activities were managed within the project’s safety controls.
Engineering Coordination
Execution was coordinated with approved design information, shop drawings, material submissions, and consultant comments.
Testing & Commissioning
Installed systems were tested, inspected, adjusted where required, and prepared for formal project handover.
Close-Out Documentation
Testing records, as-built drawings, O&M information, warranties, and supporting handover documents completed the delivery cycle.
Engineering Supervision & Technical Manpower
A Strong Reference for High-Compliance MEP Execution
The R&D Fuel Station project demonstrates Aiwa Global Group’s ability to work in a technically controlled Saudi Aramco environment where quality, safety, engineering coordination, and documentation are equally critical to the physical installation. The result is a project story built around disciplined execution and structured close-out—not only construction activity.
Looking for Similar MEP Project Delivery?
Aiwa Global Group supports coordinated electro-mechanical projects across Saudi Arabia with engineering, site execution, testing, commissioning, and professional project close-out.